SLICE-004 Post-Implementation Review
Purpose
This review page records the close-out state for the final merged core slice of the prototype.
SLICE-004 completed the remaining core operational maturity work:
- diagnostics timeline and counters
- explicit acknowledgment and recovery flow hardening
- simulator profile selection
- richer run metrics and persisted summary fields
Current Evidence
As of 2026-04-17:
dotnet build InspectionPrototype.slnx -nodeReuse:false -p:UseSharedCompilation=falsepassesdotnet test InspectionPrototype.slnx -nodeReuse:false -p:UseSharedCompilation=falsepasses with 222 tests- the slice-4 review findings were fixed in code and locked down with regression coverage
- the operator UI now exposes simulator profile selection alongside the richer diagnostics workspace
Close-Out Notes
This slice is considered closed out for the prototype roadmap.
That does not mean every future improvement is finished. It means the remaining planned core themes from the roadmap are now implemented in one stable slice and do not need to be reopened as separate core phases.
Residual Follow-Ups
The remaining work from this point is optional expansion work, not unfinished core slice work:
- trend charts and operator metrics
- performance instrumentation and memory profiling hooks
- a conditional ADR if workflow complexity ever outgrows the current approach
Verification Record
Verification used for this close-out:
- Build the solution with shared compilation disabled to avoid transient file-lock noise.
- Run the full automated test suite.
- Confirm slice-4 regression fixes for double-start protection, simulator profile selection, duplicate fault handling, and diagnostics projection churn.
Manual Smoke Recommendation
If you are preparing a demo or release candidate, it is still worth doing one operator smoke pass:
- Connect to the simulated machine.
- Load a recipe and home the stage.
- Start a run and observe diagnostics and live metrics.
- Change the simulator profile while idle and confirm it affects the next run.
- Inject a fault, acknowledge it, clear it, and recover explicitly.
- Confirm run history and last-run summary show the richer slice-4 fields.
Next Planning Step
After SLICE-004 close-out, move only to optional expansion slices.
The recommended next one is:
SLICE-008: trend charts and operator metrics