TASK-004: Implement Operational Maturity
- Status: Completed
- Date: 2026-04-16
- Spec: SLICE-004: Operational Maturity
- ADRs: ADR-001: Use Central App State Store, ADR-002: File-Backed Run History Store Before Database Persistence, ADR-004: Use One Operational Maturity Slice Before Specialized Modules
Objective
Deliver the remaining core operational maturity work as one bounded implementation phase: richer diagnostics, explicit alarm recovery behavior, configurable simulator profiles, and more informative run results and metrics.
Scope
- extend canonical app state with structured diagnostics timeline and operational counters
- provide a richer operational workspace in the UI
- separate alarm acknowledgment from clearance and recovery
- introduce named simulator profiles loaded from configuration
- enrich live results and persisted run summaries with more useful metrics
- add focused tests and sample assets for the new behavior
Non-Scope
- trend charts or analytics dashboards
- a new multi-screen application shell
- hot reload or editing UX for simulator profiles
- advanced image synthesis
- explicit state machine library adoption
- performance instrumentation as a required deliverable
AI Tool Guidance
Do not hand this whole task to one AI chat.
Use the smaller task pack for implementation:
- TASK-004A: Diagnostics State and Timeline
- TASK-004C: Alarm Acknowledgment and Recovery Flow Hardening
- TASK-004D: Simulator Profiles and Configuration
- TASK-004E: Inspection Results and Run Metrics
- TASK-004B: Operational Workspace UI and Fault Injection
- TASK-004F: Integration Tests and Sample Assets
The recommended order, cost guidance, and copy or paste prompts are documented in SLICE-004 Task Pack.
Acceptance Criteria Mapping
The implementation must satisfy all acceptance criteria from SLICE-004.